IT equipment may have a longer service life than a technical floor, in which case the technical floor must sooner or later be replaced without interrupting operations.

The computer rooms delivered in the 1990s and 2000s were the subject of specifications that failed to anticipate future operating constraints. future operating constraintsthe evolution of rack weights, UPS and other equipment.

Leaks in the chilled water networks could also have oxidized the technical floor framework, and various works could have jeopardized the assembly of the floor.

That's why we offer you a range of active equipment lifting solutions based on the methodology invented and put into practice by Patrick Charbonneaux® since the 1980s.

This method is covered by insurance insurance and guarantees specific to IT equipment allows you to lift equipment from your production room and install a new technical floor.

Where we operate

No impact on continuity of IT production

Our achievements

Robson IT team at work in a data center